A combination of cyclone and vert techniques for the management of construction projects

  • Mohamad Nayfeh

Student thesis: Doctoral ThesisDoctor of Philosophy

Abstract

Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process.
This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control.
Based on the outline of the nature of site control, this research developed a simulation based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost and special nodes for evaluating time and cost.
A large software package is written to handle the input, the simulation process and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system.
Data from real life projects were used to demonstrate the capability of the technique.
Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.
Date of AwardJan 1989
Original languageEnglish
SupervisorA. Traill (Supervisor)

Keywords

  • network analysis
  • VERT-CYCLONE
  • tconstruction management